Shipbuilding & Ship Repair
From steel cut to sea trials: see every block, part and delay before it hits the dock.
Design, planning, stores and suppliers run on separate systems; one late block or valve slips the dock schedule.
The question it answers
“Which blocks will miss dock erection because of material shortages or design changes?”
What changes: On-time delivery, less rework, fewer penalty days.
All seven layers
How ForgeOrbis works for shipbuilding.
- 01
Connect
IngestData sources
- Ship CAD/PLM (e.g., AVEVA Marine, Siemens Teamcenter)
- ERP
- Production planning (often Excel)
- Stores
- Supplier portals
- Cutting/welding machine data
- Class inspection records
- 02
Understand
ExtractFacts from unstructured data
- Drawing and BOM revisions
- Inspection reports
- Supplier delivery notes
- Shift logs
- 03
Unify
ResolveWhat must be matched
- Same part/material across CAD, ERP and stores
- Supplier name variants
- Block IDs across planning and shop floor
- 04
Relate
ModelObjects and links (the ontology)
- Hull
- Block
- Work Package
- Part
- Material
- Supplier
- Dock
- Inspection
- Design Revision
- 05
Decide
AskExample question
“Which blocks will miss dock erection because of material shortages or design changes?”
- 06
Execute
ActApproved actions
- Expedite purchase order
- Re-sequence work packages
- Notify class surveyor
- Flag design-change impact
- 07
Trust
GovernTrust and compliance
- Defence-yard data segregation
- Design IP protection
- Audit of every schedule change
What a pilot measures
Each pilot measures 2 to 3 KPIs you already track, before and after. We publish no benefit numbers until a customer has measured them.
- Schedule variance (days)
- Rework hours
- Material shortage incidents
- Man-hours per CGT
- Inspection pass rate
Who it is for
- Yard production head
- CMD of PSU shipyard
Where it stands today
What runs today, and what we are still building.
We would rather tell you up front than discover it in week three. A pilot starts with what runs today.
The platform
- 01ConnectIngestPartly live
- 02UnderstandExtractPartly live
- 03UnifyResolveRoadmap
- 04RelateModelPartly live
- 05DecideAskLive
- 06ExecuteActLive
- 07TrustGovernPartly live
Still to build for shipbuilding
- Enterprise connectorsLayer 1ERP, databases, ticketing, CRM, TMS/WMS, PLM connectors
- Document extractionLayer 2OCR + layout, forms, tables, scanned records, stamps
- Entity resolution (assets/things)Layer 3Vessels, parts, equipment tags, SKUs, sites across systems
- Optimization/schedulingLayer 5Berth, crew, production and dispatch planning engines
Live means shipping in the product today. Partly live means part of the layer ships today and the rest is being built. Roadmap means being built and not available yet. We never show it as available.
More in Maritime, Logistics & Aviation
Book a pilot
One site, one problem, measured in weeks.
Each pilot measures 2 to 3 KPIs you already track, before and after. We publish no benefit numbers until a customer has measured them.